To continue to provide safe and reliable electric service in this area, Oncor Electric Delivery Company LLC (Oncor) proposes to construct a new 345 kilovolt (kV) transmission line that will extend from Oncor’s Muscovy Switch, located approximately 0.7 miles northeast of the intersection of Farm-to-Market (FM) 3349 and United States Highway (US) 79, to Oncor’s Voss Lake Switch, located approximately 2.1 miles south of the intersection of US 79 and FM 1786. The Project is currently planned for completion in Fall 2029.
Voltage and Structure Type – The project includes a new 345 kV Double Circuit Transmission Line, approximately 26-40 miles in length. The project will be constructed on self-supporting monopole structures.
Public Meeting – Notice of the public meeting will be published in the following newspapers on the specified date: